Umm Qasr port begins the early stages of the e-governance project
on 17/12/2012 | Author FH | readings 15 |
12:18 PM
Basra - electronic integrity
A director in the port of Umm Qasr Safaa Abdel Hussein port administration sought to apply the electronic management system " IT SISTEM "and get rid of the way paper written in collaboration with a Japanese company specializing.
To this administration ended the port of Umm Qasr lifting operations Aguarq and secure navigation routes sound around him, saying to add Khoznah space equivalent to one-third of the original port.
The general director of the port of Umm Qasr, "the port became free from all Aguarq after the adjournment of navigational channels leading to the port and became locked navigational and Balawamat furnished."
He said Abdul-Hussein said that "correspondences underway with Takrav German manufacturer of cranes port old and stalled the 34 crane and it is hoped that are fixed during the next year and returned to work, leading to run manpower and extra increases the speed of cargo handling as specialized and can reach to the farthest point in the ship. "
[You must be registered and logged in to see this link.]
on 17/12/2012 | Author FH | readings 15 |
12:18 PM
Basra - electronic integrity
A director in the port of Umm Qasr Safaa Abdel Hussein port administration sought to apply the electronic management system " IT SISTEM "and get rid of the way paper written in collaboration with a Japanese company specializing.
To this administration ended the port of Umm Qasr lifting operations Aguarq and secure navigation routes sound around him, saying to add Khoznah space equivalent to one-third of the original port.
The general director of the port of Umm Qasr, "the port became free from all Aguarq after the adjournment of navigational channels leading to the port and became locked navigational and Balawamat furnished."
He said Abdul-Hussein said that "correspondences underway with Takrav German manufacturer of cranes port old and stalled the 34 crane and it is hoped that are fixed during the next year and returned to work, leading to run manpower and extra increases the speed of cargo handling as specialized and can reach to the farthest point in the ship. "
[You must be registered and logged in to see this link.]