Buildings looked in the forty-work projects, Dhi Qar, Maysan
Sunday 08/11/2015 0:28
Baghdad / Baghdad news
the cadre advanced from the Ministry of Construction and Housing field tour in the province of Dhi Qar, Maysan, for the forty-work a number of projects. The tour director general of buildings circle Hussein Majid Hussein and Director General of the National Center for Engineering Consultancy Jabbar Hamza, director general of the FAO General Contracting Ammar Abdul Razak, it came Niva to the directives of the Minister of Construction and Housing and public municipalities Tariq Kikhany in follow-up operation of the projects entrusted to the ministry and to achieve set goals through the implementation of field visits to inform directly on the work of the engineering staff and workflow accordance with the highest technical and engineering specifications and the required matching engineering plans. He briefed the delegation during the visit to the functioning of the project and the main obstacles and the problems facing the implementation of the action and find a rapid and radical solutions that serve the progress of work through direct guidance and to avoid all the obstacles, and on the sidelines of the tour met with Director General of the buildings department and his accompanying delegation, the Governor of Maysan Ali Douai in the governorate building , where he was talking about the projects implemented by the Buildings Department and the coordination and cooperation in the province. He praised the conservative significant role which is given by the cadres and engineering expertise of the Department of buildings in the province service, which included a visit Maysan province lose the following projects: the birth and the child 260 capacity bed hospital project and overlooks site on the Tigris River and is surrounded by streets of its sides the three either the fourth is adjacent to the role of residential The project area is about (56,000) m 2 and by building area of about (32000) m 2 and the percentage of completion of approximately (96%) The project consists of three main parts: the building Home: - a main part of the project area of 25,000 m2 consists of three floors and contain events Basic Hospital, namely, (galleries operations 11 lounge, lounges, lying with a capacity of 260 beds, laboratories and laboratory department, radiology, ultrasound, emergency children's section and premature Department in addition to the utilities and other). buildings facilities: - the buildings chock in the project and a number (12) building include (Doctors housing, queries, the nursery, the bodies, the main store, tank building and unity of treatment). Business Location and includes streets, sidewalks, parks, squares and sheds for parking and plant oxygen and medical Holocaust and the station Bio rural housing project: The project includes the establishment of 3,000 housing units within good hand (1500) within the terms and (1500) within a kilometer (zero -27) cost of the first part of the project around (46.915) billion dinars and the cost of Part II around (53.257) billion dinars. In the province of Dhi Qar visit included a draft rest house employees of the Ministry of Construction and Housing project consists of a main building of three floors contain ground floor hall meetings with queries and cafeteria, health groups and chambers of service. It contains the first and second floors of the Ciutat sleep Number 14 in addition to service rooms 2 contains the project on the Internet system and telephone, fire control, security and cost of the project (2,563,811,500) dinars. and the draft National Human Rights Network Building: The building consists of three floors and an area of Faculty of 1000 m2 The first floor consists of ( rooms with the head of the department and the lobby of the room. The second floor contains (12) room in addition to the kitchen and pantry and the lobby of the movement. The third floor consists of a Director and queries room and Associate Director, meeting room and hall lobby, the main addition to the operator and the store room The cost of this project is about (2,206,590,000) dinars.
[You must be registered and logged in to see this link.]
Sunday 08/11/2015 0:28
Baghdad / Baghdad news
the cadre advanced from the Ministry of Construction and Housing field tour in the province of Dhi Qar, Maysan, for the forty-work a number of projects. The tour director general of buildings circle Hussein Majid Hussein and Director General of the National Center for Engineering Consultancy Jabbar Hamza, director general of the FAO General Contracting Ammar Abdul Razak, it came Niva to the directives of the Minister of Construction and Housing and public municipalities Tariq Kikhany in follow-up operation of the projects entrusted to the ministry and to achieve set goals through the implementation of field visits to inform directly on the work of the engineering staff and workflow accordance with the highest technical and engineering specifications and the required matching engineering plans. He briefed the delegation during the visit to the functioning of the project and the main obstacles and the problems facing the implementation of the action and find a rapid and radical solutions that serve the progress of work through direct guidance and to avoid all the obstacles, and on the sidelines of the tour met with Director General of the buildings department and his accompanying delegation, the Governor of Maysan Ali Douai in the governorate building , where he was talking about the projects implemented by the Buildings Department and the coordination and cooperation in the province. He praised the conservative significant role which is given by the cadres and engineering expertise of the Department of buildings in the province service, which included a visit Maysan province lose the following projects: the birth and the child 260 capacity bed hospital project and overlooks site on the Tigris River and is surrounded by streets of its sides the three either the fourth is adjacent to the role of residential The project area is about (56,000) m 2 and by building area of about (32000) m 2 and the percentage of completion of approximately (96%) The project consists of three main parts: the building Home: - a main part of the project area of 25,000 m2 consists of three floors and contain events Basic Hospital, namely, (galleries operations 11 lounge, lounges, lying with a capacity of 260 beds, laboratories and laboratory department, radiology, ultrasound, emergency children's section and premature Department in addition to the utilities and other). buildings facilities: - the buildings chock in the project and a number (12) building include (Doctors housing, queries, the nursery, the bodies, the main store, tank building and unity of treatment). Business Location and includes streets, sidewalks, parks, squares and sheds for parking and plant oxygen and medical Holocaust and the station Bio rural housing project: The project includes the establishment of 3,000 housing units within good hand (1500) within the terms and (1500) within a kilometer (zero -27) cost of the first part of the project around (46.915) billion dinars and the cost of Part II around (53.257) billion dinars. In the province of Dhi Qar visit included a draft rest house employees of the Ministry of Construction and Housing project consists of a main building of three floors contain ground floor hall meetings with queries and cafeteria, health groups and chambers of service. It contains the first and second floors of the Ciutat sleep Number 14 in addition to service rooms 2 contains the project on the Internet system and telephone, fire control, security and cost of the project (2,563,811,500) dinars. and the draft National Human Rights Network Building: The building consists of three floors and an area of Faculty of 1000 m2 The first floor consists of ( rooms with the head of the department and the lobby of the room. The second floor contains (12) room in addition to the kitchen and pantry and the lobby of the movement. The third floor consists of a Director and queries room and Associate Director, meeting room and hall lobby, the main addition to the operator and the store room The cost of this project is about (2,206,590,000) dinars.
[You must be registered and logged in to see this link.]