The completion of 85% of the project Ekal Allarroaii in Wasit at a cost of 11 billion dinars
November 21, 2015 0
Agricultural Committee in the Wasit province, announced the completion of a project to achieve advanced ratios (Ekal) Allarroaii.
The head of the Agricultural Committee Council of Wasit province, Hashim al-Awadi said in a statement seen by the agency of our economy news that the technical and engineering staff in the maintenance of irrigation projects Directorate achieved completion rates exceeded 85 percent in the works of the project (Ekal) Allarroaii southern city of Kut, adding that the project, which passes sizes of agricultural land for the provinces of Wasit and Dhi Qar at a cost of 11 billion dinars.
Al-Awadi said that the province previously announced that this project negatively affect the water go as a result of its share large amounts of water to the province of Dhi Qar, noting that the project was designed on the basis of the water level zero / ten, while supposed to be designed on the basis of 2/11, which led to problem in the case of irrigation sprinkler Gharraf River because of low water levels
He added that the project included the execution of the dirt along the 18 km divided by 7 kilometers within the administrative border of the province of Wasit, 11 km within the boundaries of Dhi Qar province and re-burial and Alhdl the amount of 1.15 million cubic meters, as well as the work of casting the amount of 340 000 square meters.
[You must be registered and logged in to see this link.]