Maysan announces completion of new designs of the Tigris Street at a cost of 480 million dinars
Source: Editorial Board
By: editor
Date: Friday 10/26/2012 12:21 pm
The Governor of Maysan Ali Douai required for the completion of new designs for the development of Tigris Street located in the city center by the Advisory Office of the Faculty of Baghdad's Mustansiriya University. "
The Douai "told him PIO reached version (for our Online) has been completed new designs for the development and expansion of street Tigris and included the idea of architectural and detailed drawings and bills of quantities cost 480 million dinars and the duration of work 60 days.
And between Douai "The new design includes the construction of recreational areas, bars, cafés and restaurants overlooking the Tigris River as well as the monument modern electric lighting as well as on the work side and sidewalks Siding and artistic style and modern"
He added: This step comes as part of upgrading service and the reality in the center of urban architecture to give aesthetic touches to regions where will direct the implementation of the project through 2013.
It should be noted here that the Tigris Street is 4 km long starts from the bridge of the martyrs in area Awahh to bridge area Almagdah ".
[You must be registered and logged in to see this link.]
Source: Editorial Board
By: editor
Date: Friday 10/26/2012 12:21 pm
The Governor of Maysan Ali Douai required for the completion of new designs for the development of Tigris Street located in the city center by the Advisory Office of the Faculty of Baghdad's Mustansiriya University. "
The Douai "told him PIO reached version (for our Online) has been completed new designs for the development and expansion of street Tigris and included the idea of architectural and detailed drawings and bills of quantities cost 480 million dinars and the duration of work 60 days.
And between Douai "The new design includes the construction of recreational areas, bars, cafés and restaurants overlooking the Tigris River as well as the monument modern electric lighting as well as on the work side and sidewalks Siding and artistic style and modern"
He added: This step comes as part of upgrading service and the reality in the center of urban architecture to give aesthetic touches to regions where will direct the implementation of the project through 2013.
It should be noted here that the Tigris Street is 4 km long starts from the bridge of the martyrs in area Awahh to bridge area Almagdah ".
[You must be registered and logged in to see this link.]