Transport reveals new information through development: high-speed trains and European operating systems
Reconstruction and building
Economy News-Baghdad
The Ministry of Transport is studying the preparation of designs for the development road, after obtaining the necessary approvals to determine the proposed routes for the road, with its two parts, the
highway, and the
railway line for
transporting passengers and goods,
from the large port of Faw to the Turkish border, with a
length of 1175 km.
And the Ministry of Transport stated in a statement that "the
Minister of Transport obtained preliminary approvals to determine the tracks of the project, which tops the ministry's work priorities, as
it is one of the strategic projects adopted by the ministerial program." He explained, "The
railway line starts from the large port of Faw towards the northern regions, with a
capacity in the first phase of
3.5 million containers, and
22 million tons of (random) bulk cargo," stressing that "the
load will be raised in the second phase to
7.5 million containers." and
33 million tons of cargo. The statement indicated that
"surveillance cameras will be along the road line, in addition to the presence of
rest areas for passengers, and
others for loading and unloading." He added, "The
railway line will be one for transporting
passengers and another for
goods," noting that "a
high-speed train with a speed of 300 kilometers per hour will be allocated to transport passengers, with a
capacity of 13.8 million passengers annually." The statement added, "The
second railway line will be dedicated to goods, at a
speed ranging from 130 to 140 kilometers per hour, and will run on electricity," explaining that this
line "will pass through about nine governorates." The statement pointed out that "the
transportation system that will be used in the project is the European system, with the aim of
continuity of the global train movement without stopping,
taking into account the issue of millions of visits." The statement concluded that "the
highway will be (To Wei) with a length of 1190 km, starting
from the port of Faw and passing through the desert areas, because
it is designated for trucks, and there is
no need for it to enter the cities."
Views 239 Added 04/16/2023 - 8:40 PM
[You must be registered and logged in to see this link.]
Reconstruction and building
Economy News-Baghdad
The Ministry of Transport is studying the preparation of designs for the development road, after obtaining the necessary approvals to determine the proposed routes for the road, with its two parts, the
highway, and the
railway line for
transporting passengers and goods,
from the large port of Faw to the Turkish border, with a
length of 1175 km.
And the Ministry of Transport stated in a statement that "the
Minister of Transport obtained preliminary approvals to determine the tracks of the project, which tops the ministry's work priorities, as
it is one of the strategic projects adopted by the ministerial program." He explained, "The
railway line starts from the large port of Faw towards the northern regions, with a
capacity in the first phase of
3.5 million containers, and
22 million tons of (random) bulk cargo," stressing that "the
load will be raised in the second phase to
7.5 million containers." and
33 million tons of cargo. The statement indicated that
"surveillance cameras will be along the road line, in addition to the presence of
rest areas for passengers, and
others for loading and unloading." He added, "The
railway line will be one for transporting
passengers and another for
goods," noting that "a
high-speed train with a speed of 300 kilometers per hour will be allocated to transport passengers, with a
capacity of 13.8 million passengers annually." The statement added, "The
second railway line will be dedicated to goods, at a
speed ranging from 130 to 140 kilometers per hour, and will run on electricity," explaining that this
line "will pass through about nine governorates." The statement pointed out that "the
transportation system that will be used in the project is the European system, with the aim of
continuity of the global train movement without stopping,
taking into account the issue of millions of visits." The statement concluded that "the
highway will be (To Wei) with a length of 1190 km, starting
from the port of Faw and passing through the desert areas, because
it is designated for trucks, and there is
no need for it to enter the cities."
Views 239 Added 04/16/2023 - 8:40 PM
[You must be registered and logged in to see this link.]